ALL TRADES were 100% complete the first week in July with our
FCO (final occupancy permit) acquired shortly thereafter. 7 of 9 units have
been leased/occupied.
Enjoy the photos and video links below.
andy
P.S. Matt and I are already on to our next project slated for
occupancy late 2017…STAY TUNED.
CERAMIC TILE: arben is installing kitchen backsplash tile.
CERAMIC TILE: full height splash, DONE...ready for appliances.
READY for appliances in unit 1.
CARPET: we have been working with ken for more than 30 years.
CONCRETE: pouring entry and ramp slabs to units 1-3.
CONCRETE: slabs complete.
PAINTING: ted's finishing up the service corridor.
PLUMBING: slavek is installing a lav faucet.
ORNAMENTAL IRON/CARPENTERS: our aluminum/steel fabricator teams up with the CARPENTERS to complete the exterior entry canopies and skin ...each has certain required skills...lotsa fotos to follow.
ORNAMENTAL IRON/CARPENTERS: aluminum armatures are being attached.
ORNAMENTAL IRON/CARPENTERS: aluminum armatures are being attached.
ORNAMENTAL IRON/CARPENTERS: aluminum armatures are being attached.
ORNAMENTAL IRON/CARPENTERS: aluminum armatures are being attached.
ORNAMENTAL IRON/CARPENTERS: aluminum armatures are being attached.
ORNAMENTAL IRON/CARPENTERS: aluminum armatures are being attached.
ORNAMENTAL IRON/CARPENTERS: aluminum armatures are being attached. final positions have been set and are welded into place.
ORNAMENTAL IRON/CARPENTERS: aluminum armatures are being attached. almost ready for "skin".
ORNAMENTAL IRON/CARPENTERS: aluminum armatures are being "skinned". vertical surfaces receive 1/8" aluminum sheet.
ORNAMENTAL IRON/CARPENTERS: aluminum armatures are being attached.
ORNAMENTAL IRON/CARPENTERS: aluminum canopy armatures receive perforated aluminum sheet which allows water to pass through. this prevents waterproofing problems at the brick wall. exterior lighting is integrated into the armature with the pipe used as electrical conduit.